Aetna

Aetna’s Headquarters

As part of Aetna’s participation in the Connecticut Energy Efficiency Fund (CEEF) Retro-Commissioning Program, Colliers Project Leaders was retained to provide project management services Aetna’s Home Office in Hartford, CT.

Client

Aetna Life Insurance Company

Location

Hartford, CT

Project Scale

1,800,000 gsf

Effective. Efficient. Excellent.

As part of Aetna’s participation in the Connecticut Energy Efficiency Fund (CEEF) Retro-Commissioning Program, Colliers Project Leaders was retained to provide Aetna’s Home Office in Hartford, CT with a building survey, retro-commissioning investigation, implementation services, training, and measurement and verification for four buildings encompassing 1,800,000 square feet of office space.

  • The objectives of the retro-commissioning initiative included:
  • Improve overall energy consumption and operating performance
  • Improve the building's ENERGY STAR rating
  • Identify system operation, control and maintenance issues
  • Reduce occupant complaints and improve indoor environment
  • Develop persistence strategies to ensure improvements stand over time

As a result, we proposed the implementation of the following energy conservation measures:

  • Optimization of secondary CHW pumping station
  • Enhance tertiary CHW pumping station
  • Upgrade 8 large AHUs and add pressurization control for the Rogers Building
  • Improve controls for 7 snow melt systems
  • Improve controls & sequences for the steam boiler combustion air system
  • Add DDC seasonal "shut-off" control for existing heating PRVs
  • Enhance existing perimeter fan coil unit operation
  • Optimize 8 atrium building AHUs
  • Modify kitchen and dining area AHUs and correct air pressure imbalances
  • Add O2 control for existing steam boiler
  • Add VFDs to chilled water plant primary chilled water pumps